The Hyderabad Airport Express Metro, also known as the Airport Metro, is a proposed semi-high-speed rail line that will connect Mindspace Junction and Rajiv Gandhi International Airport in Shamshabad. The project, funded by the Government of Telangana, is designed to improve connectivity to the airport and facilitate the growth of the city by attracting more businesses and tourists. The Airport Metro will also help reduce pollution by taking cars and two-wheelers off the road.
| Characteristics | Values |
|---|---|
| Name | Hyderabad Airport Express Metro or Corridor IV |
| Length | 31 km (19 mi) |
| Speed | Semi-high speed |
| Stations | 10 |
| Funding | Government of Telangana |
| Operator | Hyderabad Airport Metro Limited (HAML) |
| Purpose | Airport passengers and reverse commute |
| Safety features | Half-height platform screen doors (PSD) |
| Other features | Automated fare collection (AFC) gates, Flight information display system (FIDS), information desk, lifts, escalators, stairs |
Explore related products
What You'll Learn
- The Hyderabad Airport Metro Express is a semi-high-speed rail line
- The project is funded by the Telangana government and executed by HAML
- The metro route will have 9 elevated stations and 1 underground station
- The project is expected to boost the economy of Hyderabad
- The metro will connect Mindspace Junction and Rajiv Gandhi International Airport

The Hyderabad Airport Metro Express is a semi-high-speed rail line
The rail line will be approximately 31 km long, with 29.3 km being elevated and 1.7 km being underground. The route will have 9 elevated stations and one underground station. The journey from Raidurg Metro Station to the airport is expected to take around 30 minutes. The first two levels of the interchange station at Raidurg will accommodate the Airport Metro, and the top two levels will accommodate the extended Blue Line (Corridor 3) terminal station.
The foundation stone for the Hyderabad Airport Express Metro was laid on December 9, 2022, by the Chief Minister of Telangana, K. Chandrashekar Rao. The project is expected to be completed by the beginning of 2026. The Detailed Project Report (DPR) for the Hyderabad Airport Metro was prepared by the Delhi Metro Rail Corporation (DMRC) in 2018-2019. However, it has not been made available to the public.
The Hyderabad Airport Metro will have three coaches per train, with a maximum speed of 120 kmph. The trains will be designed to accommodate luggage, and there will be a focus on providing adequate parking facilities at the new metro stations. The route will pass through Raidurg, Bio-Diversity Junction, Nanakramguda Junction, Narsingi, Manchirevula, TS Police Academy, Rajendranagar, Shamshabad, Airport Cargo, and finally, the airport terminal.
Airports: A Dangerous Place or Safe Haven?
You may want to see also
Explore related products

The project is funded by the Telangana government and executed by HAML
The Government of Telangana has been working to improve metro connectivity to the Rajiv Gandhi International Airport in Shamshabad, Hyderabad. The project, known as the Hyderabad Airport Metro Express, involves the construction of a 31-km semi-high-speed rail line with 10 stations, connecting Mindspace Junction to the airport. The project is estimated to cost around ₹6,250 crore (approximately US$730 million) and is expected to be completed by the beginning of 2026.
The Telangana government has shown a strong commitment to this project by allocating significant funds in the state budgets over the years. In the 2022-2023 state budget, the government allocated ₹2,377.35 crore (US$280 million) towards the Hyderabad Metro Rail (HMR). This included ₹377.35 crore specifically for Airport Metro connectivity. Additionally, the government has provided funds for land acquisition, project reports, and developmental work, demonstrating their support for the project.
Hyderabad Airport Metro Limited (HAML) plays a crucial role in executing this project. HAML was established as a special purpose vehicle company by the Government of Telangana in March 2018. In December 2022, HAML engaged two survey teams to gather ground data for alignment finalization and station location determination. HAML has also been actively involved in seeking approvals, conducting pre-bid meetings, and overseeing various stages of the project, including survey work, alignment finalization, and soil testing.
The project has seen steady progress, with the foundation stone being laid by Telangana's Chief Minister K. Chandrashekar Rao on 9 December 2022. The design of the Nanakramguda junction metro station, located about 2.5 km from Wipro circle, was announced in February 2023. In June 2023, HAML's Managing Director, NVS Reddy, informed that orders for 11 metro trains with three coaches each would be placed by the end of the year. The project has attracted interest from reputed national and international engineering consultancy firms, with L&T emerging as the lowest bidder for the construction work.
Oregon's Airport Network: How Many Are There?
You may want to see also
Explore related products

The metro route will have 9 elevated stations and 1 underground station
The Hyderabad Airport Metro Express is a semi-high-speed rail line that will connect Rajiv Gandhi International Airport in Shamshabad to the city. The project is expected to be completed by the beginning of 2026 and will be funded by the Government of Telangana. The total cost of the project is estimated to be around ₹6,250 crore (US$730 million).
The existing Blue Line corridor from Raidurg Station to the new Airport Metro Raidurg Station will be extended by about 900 meters, creating an integrated four-level station. The first two levels will accommodate the Airport Metro station, while the top two levels will be for the Blue Line terminal station. The metro viaduct will cross the junction near the IKEA store at a height of about 21 meters.
The Airport Metro is expected to boost the economy of Hyderabad by attracting more businesses and tourists to the city. It will also provide connectivity to the Old City, with Chandrayangutta serving as an interchange station. The project has faced some technical challenges due to the presence of numerous flyovers, underpasses, and high-rise buildings along the route, but engineers are working to overcome these obstacles.
Duty-Free Shopping at Jacksonville Airport: What to Expect
You may want to see also
Explore related products

The project is expected to boost the economy of Hyderabad
The Hyderabad Airport Metro Express is a semi-high-speed rail line that will connect Mindspace Junction and Rajiv Gandhi International Airport in Shamshabad via 10 stations. The project is expected to boost the economy of Hyderabad by attracting more businesses and tourists to the city. The foundation stone was laid by Telangana's Chief Minister on December 9, 2022, and the project is estimated to be completed by the beginning of 2026.
The 31 km-long airport metro route is likely to have one underground station and nine elevated stations. The route will pass through Raidurg, Bio-Diversity Junction, Nanakramguda, Narsingi, Manchirevula, TS Police Academy, Rajendranagar, Shamshabad, Airport Cargo, and Airport Terminal. The airport route will have 29.3 km elevated and a 1.7 km underground section to connect to the airport terminal. The metro viaduct will cross the junction near the IKEA store at about 21 meters high.
The project is being funded by the Government of Telangana, which has allocated approximately US$730 million for its construction. The airport metro line is expected to reduce travel time between Raidurg and Rajiv Gandhi International Airport to just 30 minutes. The project is also expected to accelerate realty growth in the burgeoning areas of the city.
The Hyderabad Metro Rail project is transforming public connectivity in the historic city, and the addition of the Airport Metro is expected to further enhance the city's development. The project aims to provide better passenger facilities and maximize ridership by creating adequate parking facilities, improving last-mile connectivity, and providing space for luggage in airport metro trains. Furthermore, the development of the metro rail is expected to encourage the growth of the old city and its surroundings, opening it up for rapid development.
Best Airports to Access Fort Benning Army Base
You may want to see also
Explore related products

The metro will connect Mindspace Junction and Rajiv Gandhi International Airport
The Hyderabad Metro Airport Express Line is a proposed semi-high-speed rail line that will connect Mindspace Junction and Rajiv Gandhi International Airport in Shamshabad. The total length of the line is 31 km (19 mi), with 29.3 km (18.2 mi) elevated and a 1.7 km (1.1 mi) underground section to connect to the airport terminal. The metro line will have 10 stations, including Mindspace, Raidurg, Biodiversity, Nanakramguda, Narasingi, TSPA Junction, Rajender Nagar, Shamshabad Junction, Airport Cargo, and RGIA Terminal (the only underground station). The estimated cost of the project is Rs. 6,250 crore.
The project is being funded by the Government of Telangana and executed by Hyderabad Airport Metro Ltd (HAML). The foundation stone was laid by the Chief Minister of Telangana, K. Chandrashekar Rao, in December 2022, and the project is expected to be completed by the beginning of 2026. The metro line is designed to provide a fast and efficient mode of transportation for airport passengers and also for the reverse commute of those who live in extended parts of the city, allowing them to reach their workplaces within about 20 minutes.
The stations along the route will be equipped with facilities such as security screening, check-ins, baggage handling, information desks, and Flight Information Display (FID) boards. The trains will have three coaches, with the ability to expand to six coaches in the future, and will operate at a maximum speed of 120 kmph. The metro line will also feature half-height platform screen doors (PSD) for improved passenger safety and bolster-less bogies at each station.
The Hyderabad Airport Metro project is expected to facilitate the development of the city's outskirts, providing affordable housing for lower-income groups and better accommodation for the middle class at lower costs. It will also cater to the unprecedented growth of Hyderabad, making it a preferred commute option for many residents.
Gulf Shores Alabama: Which Airport is Best?
You may want to see also
Frequently asked questions
The Hyderabad Airport Express Metro or Corridor IV is a proposed semi-high-speed rail line that will connect Mindspace Junction and Rajiv Gandhi International Airport. The project is currently under development and is funded by the Government of Telangana.
The total length of the line is 31 km (19 mi), with 9 elevated stations and one underground station.
The project aims to provide rapid connectivity to the airport, reduce pollution by taking cars off the road, and boost the economy of Hyderabad by attracting more businesses and tourists.
Yes, there are alternative options to get to the airport. You can take a bus, taxi, or ride-sharing services such as Uber or Ola. These options offer varying levels of convenience and cost.