Orlando International Airport is undergoing a series of upgrades and expansions to meet the growing demand for tourism in Central Florida. In September 2022, the airport opened Terminal C, a $2.8 billion project with 15 gates, capable of handling up to 10 million passengers annually. Terminal C is currently being expanded with $62 million in federal funding, which will add new gates and a connector bridge to the Brightline train station. The airport is also constructing a pedestrian bridge to connect Terminal C to the Intermodal Terminal, and adding moving walkways to improve passenger experience. These upgrades demonstrate the airport's commitment to enhancing its infrastructure and meeting the demands of travellers.
| Characteristics | Values |
|---|---|
| New features | A time- and energy-saving pedestrian bridge, rental car counters, and moving walkways |
| Terminals | 3 (North Terminal Complex, Terminal A, and Terminal B) |
| Terminal C gates | 20 gates initially, 8 more gates added later |
| Terminal C cost | $2.8 billion |
| Terminal C area | 1.8 million square feet |
| Terminal C capacity | 10 million passengers annually |
| Terminal C passengers | 6.4 million passengers in the first year |
| Terminal C flights | 48,300 flights in the first year |
| Terminal C construction | Completed in 2022 |
| Terminal C expansion cost | $62 million |
Explore related products
What You'll Learn

Terminal C opened in 2022
Orlando International Airport's Terminal C opened on 19 September 2022, with 15 gates and an ability to accommodate up to 10 million passengers annually. The terminal was constructed at a cost of $2.8 billion and is the largest expansion project in the airport's history. Terminal C is also known as the South Terminal Complex and is served by JetBlue Airways and a variety of international airlines. The terminal is designed to be sustainable, with features such as reduced water consumption, solar panels, and responsive lighting and temperature control systems.
The opening of Terminal C was a significant milestone in the airport's history, addressing the issue of exceeding capacity in the existing terminals. The new terminal is designed to enhance the airport's capacity and improve the overall travel experience for passengers. It is equipped with state-of-the-art technology and flexible configurations to accommodate various types of aircraft, including narrow-body, jumbo, and super-jumbo planes.
One notable aspect of Terminal C is its focus on sustainability and environmental consciousness. The terminal has implemented several design strategies to reduce its environmental impact. These strategies include the use of reduced water consumption and irrigation systems, solar panels for energy generation, and responsive lighting and temperature control systems to optimise energy efficiency. Additionally, the use of non-toxic adhesives and non-painted natural materials contributes to the terminal's sustainability goals.
To further enhance the functionality and accessibility of Terminal C, ongoing expansion and upgrade projects are taking place. These projects include the addition of eight more gates, bringing the total to 23, and the construction of a pedestrian bridge connecting the terminal directly to the Intermodal Terminal. This bridge will provide a convenient and sheltered link to the Brightline train station and People Mover Trams, improving passenger comfort and convenience.
The upgrades to Terminal C are part of a broader effort to meet the growing demand and ensure a seamless travel experience for the increasing number of tourists visiting Central Florida. With these improvements, Orlando International Airport is well-equipped to handle a higher volume of passengers and provide efficient and world-class services to travellers.
La Guardia Airport: Construction and Renovation Plans
You may want to see also
Explore related products

Terminal C is undergoing an expansion
Orlando International Airport is undergoing a series of changes to meet growing demand. Terminal C, which opened in September 2022, is already undergoing an expansion with $69 million worth of federally funded projects. Terminal C is also known as the South Terminal Complex and contains gates 230–245. It is constructed with 15 gates and can accommodate up to 10 million passengers annually.
The $62 million Terminal C expansion project includes $49 million for four additional aircraft ramp systems and $20 million for a connector bridge, providing access from the Brightline train station to Terminal C. The bridge will be a critical connection for passengers travelling from the Intermodal Terminal, which houses the Brightline train station and People Mover Trams. The enclosed walkway will also feature rental car counters.
The expansion of Terminal C is part of a broader effort to upgrade the airport's terminals, including the addition of moving walkways and other improvements to meet the needs of a record surge of flyers. The airport received a total of $260 million in federal funds for improvements, with $62 million dedicated to Terminal C.
The CEO of the Greater Orlando Aviation Authority, Kevin Thibault, emphasised that the commitment to Terminal C will help increase efficiency, optimise operations, and maintain the terminal's status as a "world-class asset".
San Jose's Airport: What's the Deal?
You may want to see also
Explore related products

A pedestrian bridge is being constructed
Orlando International Airport is undergoing a series of changes and upgrades to meet the growing demand for travel. One of the most notable current projects is the construction of a pedestrian bridge at Terminal C. This bridge will be a critical connection for passengers travelling to and from the terminal, providing an enclosed walkway with rental car counters, moving walkways, and direct access to the Intermodal Terminal, where the Brightline train station and People Mover Trams are located.
The pedestrian bridge is being built to address the challenges faced by passengers travelling between the train station and Terminal C. Previously, the only way to make this journey was through the open-air Terminal C garage, which could be a struggle, especially during the hot summer months. The new bridge will offer a more comfortable and efficient route, eliminating the need to navigate the garage with luggage.
The construction of the pedestrian bridge is part of a larger effort to enhance the airport's infrastructure and improve the overall travel experience. Terminal C itself is a significant expansion project, costing $2.8 billion and designed to accommodate up to 10 million passengers annually. The terminal features state-of-the-art technology and sustainable design strategies, including reduced water consumption, responsive lighting and temperature control systems, and solar panels.
With the addition of the pedestrian bridge, passengers can expect an even more seamless and convenient travel experience at Orlando International Airport. The bridge will streamline the process of getting to and from Terminal C, making it a welcome addition to the airport's infrastructure. This project demonstrates the airport's commitment to adapting to the record surge of flyers and ensuring efficient and comfortable travel for all its passengers.
Cape Coral, FL: Which Airport is Best?
You may want to see also
Explore related products
$145.23 $159.99
$219.99 $259.99

Terminal C is adding moving walkways
Orlando International Airport is undergoing a series of upgrades to meet the growing demand for travel to Central Florida. Terminal C, which opened in September 2022, is already undergoing an expansion with $62 million in federal funding. The terminal has 15 gates and can accommodate up to 10 million passengers annually. However, in its first year, it hosted around 6.4 million passengers on 48,300 flights.
To further enhance the efficiency of Terminal C, a $20 million connector bridge is being constructed to provide direct access from the Brightline train station to the terminal. This will include moving walkways, similar to those at Newark International Airport's Terminal A, allowing passengers to conveniently travel between the train station and the terminal. The pedestrian bridge is expected to be completed soon, providing a much-needed connection for passengers travelling with luggage.
In addition to the connector bridge, other upgrades are being made to Terminal C, including the addition of eight more gates, bringing the total to 23. These improvements are part of the airport's efforts to increase efficiency, optimise operations, and maintain its status as a "world-class asset".
Biloxi, Mississippi: Airport Accessibility and Travel Options
You may want to see also
Explore related products

A consolidated rental car facility is planned
Orlando International Airport is planning to build a consolidated rental car facility. This facility will be accessible via the existing people mover tram system. This will free up parking spaces in the A, B, and C garages, which are currently occupied by rental car companies. This is part of a series of terminal upgrades to meet growing demand.
The new facility will improve the passenger experience at Orlando International Airport. By providing a centralised location for rental car services, passengers will be able to more easily access these services without having to walk long distances or navigate through multiple garages. This will be especially beneficial for passengers with luggage or those who are rushing to catch their flights.
The consolidated rental car facility will also help to optimise the use of parking spaces. Currently, a significant number of parking spaces in the garages are occupied by rental cars, reducing the availability of parking for other passengers and visitors. By relocating the rental car operations to a dedicated facility, more parking spaces will be freed up for general use, improving the overall efficiency of the airport's parking infrastructure.
The people mover tram system will provide convenient access to the consolidated rental car facility. Passengers will be able to easily reach the facility from any of the terminals, without the need for additional shuttle services or long walks. This will improve the overall connectivity and accessibility of the airport, making it more convenient for passengers to utilise the rental car services.
The planning and construction of the consolidated rental car facility demonstrate the airport's proactive approach to addressing parking and traffic management challenges. By consolidating rental car operations and freeing up parking spaces, the airport can better accommodate the increasing demand for parking and improve the overall flow of traffic within the airport premises. This will help to reduce congestion and enhance the overall efficiency of ground transportation at the airport.
Best Airlines Flying to AMA Airport
You may want to see also
Frequently asked questions
Orlando is not building a new airport but it is undergoing several upgrades and expansions to its existing airport, Orlando International Airport.
Orlando International Airport recently opened Terminal C, which is now undergoing an expansion with $69 million worth of federally funded projects. The airport is also constructing a pedestrian bridge to connect Terminal C to the Intermodal Terminal.
The upgrades are being made to meet growing demand. Terminal C was designed to accommodate up to 10 million annual passengers, but in its first year, it hosted around 6.4 million passengers.