The new airport in Williston, North Dakota, officially known as the Williston Basin International Airport (KBDI), opened to the public on October 10, 2019, replacing the former Sloulin Field International Airport. Designed to accommodate the region’s growing population and energy industry demands, the state-of-the-art facility features a longer runway capable of handling larger aircraft, modern terminal amenities, and enhanced cargo capabilities. Its opening marked a significant milestone for the area, improving connectivity and economic opportunities for residents and businesses alike. Since its launch, the airport has continued to expand services, offering flights to major hubs and contributing to the region’s development.
| Characteristics | Values |
|---|---|
| Airport Name | Williston Basin International Airport (XWA) |
| Location | Williston, North Dakota, USA |
| Status | Open |
| Opening Date | October 10, 2019 |
| Runway Length | 8,800 feet (2,682 meters) |
| Runway Width | 150 feet (46 meters) |
| Terminal Size | 48,000 square feet (4,459 square meters) |
| Gates | 3 (with capacity for expansion) |
| Airlines | United Airlines, Delta Air Lines, Allegiant Air |
| Destinations | Denver, Minneapolis, Las Vegas, Phoenix-Mesa (seasonal) |
| Annual Passengers (pre-COVID) | Approximately 100,000 |
| Website | https://www.willistonairport.com/ |
Explore related products
What You'll Learn
- Airport Construction Timeline: Updates on when the new Williston airport construction was completed
- Official Opening Date: Confirmed date the airport officially opened for public use
- Flight Operations Status: Current status of flight operations and airlines serving the airport
- Facility Features: Overview of the airport’s amenities, terminals, and services available
- Community Impact: How the new airport affects Williston’s economy and local transportation

Airport Construction Timeline: Updates on when the new Williston airport construction was completed
The new Williston Basin International Airport (KBWD) in Williston, North Dakota, has been a highly anticipated project aimed at replacing the aging Sloulin Field International Airport. Construction on the new airport began in earnest in 2016, following years of planning and securing funding. The project was initiated to address the growing demand for air travel in the region, driven by the Bakken oil boom and the need for a modern facility capable of handling larger aircraft and increased passenger traffic. The timeline for construction was initially projected to span several years, with a target completion date set for late 2019. However, as with many large-scale infrastructure projects, various factors influenced the actual completion timeline.
By early 2019, significant progress had been made on the airport’s infrastructure, including the construction of the runway, taxiways, and the terminal building. Despite this, challenges such as weather delays, supply chain issues, and the need for additional funding adjustments pushed the completion date further into 2020. The COVID-19 pandemic also introduced unforeseen delays, impacting labor availability and material procurement. Despite these setbacks, construction continued, and by mid-2020, the airport was nearing completion, with final touches being applied to the terminal and surrounding facilities.
The official completion of the Williston Basin International Airport was announced in late 2020, with the facility ready for operational use. However, the transition from the old Sloulin Field Airport to the new airport required careful coordination, including the transfer of airlines, equipment, and personnel. The Federal Aviation Administration (FAA) conducted final inspections and approvals to ensure the airport met all safety and operational standards. By October 2020, the new airport was fully operational, with the first commercial flights taking off and landing at the new facility.
Since its opening, the Williston Basin International Airport has been a significant upgrade for the region, offering improved amenities, expanded capacity, and the ability to accommodate larger aircraft. The airport’s construction timeline, though extended beyond initial estimates, ultimately delivered a state-of-the-art facility that meets the needs of the growing Williston community and the broader region. Passengers and airlines alike have benefited from the modern infrastructure, marking a new era in air travel for northwestern North Dakota.
For those wondering, "Has the new airport in Williston, ND, opened yet?" the answer is a definitive yes. The Williston Basin International Airport has been operational since late 2020, serving as a testament to the successful completion of a complex and essential infrastructure project. Travelers can now enjoy the convenience and efficiency of this new facility, which is poised to support the region’s economic and travel needs for decades to come.
Is Detroit Airport Open 24/7? Your Complete Guide to DTW Hours
You may want to see also
Explore related products

Official Opening Date: Confirmed date the airport officially opened for public use
The new airport in Williston, North Dakota, officially known as the Williston Basin International Airport (KBWD), has been a highly anticipated project for the region. After years of planning, construction, and delays, the airport finally opened its doors to the public on October 10, 2019. This date marks a significant milestone for the community, as it replaces the former Sloulin Field International Airport, which had become inadequate to meet the growing demands of the area’s population and energy industry. The official opening date was confirmed by the Williston Basin Airport Authority and widely announced through local and regional media outlets.
Leading up to the official opening date, the airport underwent rigorous inspections and certifications to ensure it met all Federal Aviation Administration (FAA) and Transportation Security Administration (TSA) standards. The final approval for public use was granted in late September 2019, allowing the airport to proceed with its scheduled opening. On October 10, 2019, the first commercial flights began operating, with United Airlines and Delta Air Lines as the initial carriers. This date is now recognized as the confirmed official opening date for public use, as stated in official press releases and airport documentation.
The choice of October 10, 2019, as the official opening date was strategic, as it allowed the airport to be fully operational before the holiday travel season. This ensured that residents and visitors could benefit from the new facility during a period of high travel demand. The airport’s opening was celebrated with a ribbon-cutting ceremony attended by local officials, stakeholders, and members of the public, further solidifying its importance to the region. Since its opening, the Williston Basin International Airport has served as a critical hub for both commercial and general aviation, supporting the economic growth of western North Dakota.
It is important to note that while the airport officially opened on October 10, 2019, some final construction and landscaping work continued into early 2020. However, these activities did not impact the airport’s operational status or its ability to serve the public. The confirmed official opening date remains October 10, 2019, as this was the day the airport began accepting commercial flights and providing full services to travelers. This date is documented in airport records and has been consistently referenced in all official communications regarding the facility.
For those seeking clarity on whether the new airport in Williston, ND, has opened, the answer is unequivocally yes. The official opening date of October 10, 2019, is the confirmed milestone when the Williston Basin International Airport officially opened for public use. Travelers and residents can rely on this date as the definitive point at which the airport became fully operational, offering modern facilities and improved services to the region. As of now, the airport continues to operate efficiently, fulfilling its role as a vital transportation link for western North Dakota.
Is Kano Airport Open? Current Status and Operational Updates
You may want to see also
Explore related products

Flight Operations Status: Current status of flight operations and airlines serving the airport
As of the latest updates, the new airport in Williston, North Dakota, officially known as the Williston Basin International Airport (KBWD), has indeed opened and is operational. The airport commenced full operations in October 2019, replacing the former Sloulin Field International Airport. This state-of-the-art facility was designed to accommodate the growing demand for air travel in the region, particularly driven by the energy sector and increased population. Below is a detailed overview of the current flight operations status and the airlines serving the airport.
Flight Operations Status: The Williston Basin International Airport is currently operational with regular commercial flights. The airport operates year-round, providing essential connectivity for both business and leisure travelers. Flight operations are primarily scheduled during daylight hours, with some evening flights depending on airline schedules and seasonal adjustments. The airport is equipped with modern navigation and safety systems, ensuring smooth operations even in adverse weather conditions, which are common in the North Dakota region.
Airlines Serving the Airport: Currently, the airport is served by several major airlines, offering direct and connecting flights to key destinations. United Airlines operates daily flights to Denver International Airport (DEN), a major hub that provides connections to numerous domestic and international destinations. Delta Air Lines also offers daily service to Minneapolis-Saint Paul International Airport (MSP), another significant hub for further connectivity. Additionally, American Airlines has introduced seasonal flights to Dallas/Fort Worth International Airport (DFW), catering to increased demand during peak travel seasons.
Cargo and Charter Operations: While the primary focus of the airport is commercial passenger flights, it also supports cargo and charter operations. Local businesses and industries, particularly those in the energy sector, utilize the airport for transporting goods and personnel. Charter flights are available for private individuals and companies, providing flexibility for specialized travel needs. The airport’s infrastructure is designed to handle a variety of aircraft, from small private jets to larger commercial planes, ensuring versatility in its operations.
Future Expansions and Services: The airport authority is continuously working to expand services and attract additional airlines. Negotiations are underway with other carriers to introduce more routes, potentially including direct flights to Chicago and other major cities. The airport also plans to enhance its amenities, such as expanding the terminal to accommodate more passengers and improving ground transportation options. These developments aim to further solidify the Williston Basin International Airport as a vital transportation hub in the region.
In summary, the Williston Basin International Airport is fully operational, with a robust schedule of commercial flights provided by major airlines. Its modern facilities and strategic location make it a crucial asset for the region, supporting both passenger and cargo operations. As the airport continues to grow, travelers can expect even more options and improved services in the near future.
Is Newark Airport Open? Current Flight Status and Updates
You may want to see also
Explore related products

Facility Features: Overview of the airport’s amenities, terminals, and services available
The new Williston Basin International Airport (KBIS) in Williston, North Dakota, officially opened its doors in October 2019, replacing the former Sloulin Field International Airport. As a state-of-the-art facility, it boasts a range of modern amenities and services designed to enhance the travel experience for passengers. The airport features a single, two-story terminal with a spacious layout, ensuring efficient passenger flow and a comfortable environment. The terminal includes four gates, all equipped with jet bridges, which facilitate quick and convenient boarding for travelers. The design emphasizes natural light and incorporates local elements, reflecting the region’s unique character.
In terms of amenities, the airport offers a variety of services to cater to passenger needs. The terminal houses a full-service restaurant and café, providing dining options for travelers before or after their flights. Additionally, there are vending machines and a gift shop for those looking for snacks or last-minute travel essentials. For business travelers, the airport provides free high-speed Wi-Fi throughout the terminal, ensuring connectivity for work or leisure. The facility also includes rental car counters from major providers, making it easy for visitors to arrange transportation upon arrival.
The airport’s baggage claim area is designed for efficiency, with multiple carousels to handle both domestic and international flights. For added convenience, there are luggage carts available free of charge. The terminal also features restrooms and family facilities, including nursing rooms, to accommodate all travelers. Accessibility is a priority, with elevators, ramps, and designated parking spaces ensuring the airport is fully compliant with ADA standards.
Security at Williston Basin International Airport is streamlined, with TSA PreCheck available for eligible passengers, reducing wait times. The security checkpoint is equipped with advanced screening technology, ensuring a smooth and secure process. For those with longer layovers or early flights, the airport offers comfortable seating areas and charging stations throughout the terminal, allowing travelers to stay connected and relaxed.
Finally, the airport provides ample parking options, including short-term, long-term, and economy lots, all within walking distance of the terminal. Shuttle services are also available for added convenience. With its focus on functionality, comfort, and modern design, Williston Basin International Airport is well-equipped to serve the growing needs of the region, offering a seamless travel experience for all passengers.
Late-Night Bites: 24-Hour Food Options at McCarran Airport Revealed
You may want to see also
Explore related products

Community Impact: How the new airport affects Williston’s economy and local transportation
The new airport in Williston, North Dakota, known as the Williston Basin International Airport (KBDI), officially opened in October 2019, replacing the former Sloulin Field International Airport. This state-of-the-art facility has significantly impacted the local economy and transportation network, positioning Williston as a key regional hub. Economically, the airport has spurred growth by attracting more businesses and tourists to the area. With its ability to handle larger aircraft and increased passenger volumes, the airport has made Williston more accessible, fostering investment in hospitality, retail, and other service industries. Local businesses have reported increased foot traffic, and the airport itself has created numerous jobs, from construction during its development to ongoing operational roles.
In terms of transportation, the new airport has improved connectivity for residents and visitors alike. The previous airport faced limitations in runway length and infrastructure, which restricted the types of aircraft that could operate there. The Williston Basin International Airport, however, features a longer runway capable of accommodating larger commercial jets, enabling direct flights to major cities like Denver, Minneapolis, and Phoenix. This enhanced connectivity reduces travel time for locals and makes Williston a more convenient destination for business travelers and tourists. Additionally, the airport’s modern facilities, including efficient baggage handling and streamlined security processes, have improved the overall travel experience.
The airport’s impact on local transportation extends beyond air travel. Its strategic location has prompted improvements in road infrastructure, with better access routes and parking facilities benefiting both airport users and nearby communities. Public transportation options, such as shuttle services and rental car availability, have also expanded, addressing previous gaps in connectivity. These advancements have made it easier for residents to commute and for visitors to explore the region, boosting local tourism and economic activity.
For Williston’s economy, the airport has become a catalyst for diversification. Historically reliant on the oil and gas industry, the city is now seeing growth in other sectors, including healthcare, education, and tourism. The airport’s presence has encouraged the development of new hotels, restaurants, and retail spaces, creating a more vibrant local economy. Moreover, the increased accessibility has made Williston an attractive location for conferences and events, further stimulating economic activity.
However, the airport’s impact is not without challenges. The influx of visitors and businesses has put pressure on local resources, including housing and utilities. Managing this growth sustainably will be crucial for Williston’s long-term prosperity. Despite these challenges, the new airport has undeniably transformed Williston’s economic and transportation landscape, offering opportunities for growth and improved quality of life for its residents. As the airport continues to expand its services and routes, its role as a regional gateway is expected to strengthen, further benefiting the community.
Is England's Airport Open? Current Status and Travel Updates
You may want to see also
Frequently asked questions
Yes, the new Williston Basin International Airport (XWA) officially opened on October 10, 2019, replacing the former Sloulin Field International Airport.
As of the latest updates, United Airlines, Delta Air Lines, and Allegiant Air provide service to and from Williston Basin International Airport.
While the airport is designated as "international," it primarily serves domestic flights. There are no regular international flights operating from Williston Basin International Airport at this time.
The airport features modern amenities, including a spacious terminal, rental car services, free Wi-Fi, a restaurant, and a gift shop, providing a comfortable experience for travelers.